Degree Show: Painting the Floor

After painting the walls yesterday all I have to do now to prepare the space was to paint the floor. During may discussion with the technicians on Tuesday I was told that I should paint the floor on  friday as although the paint is advertised as “touch dry in two hours” it would be more like two days.

 

The paint covered the floor well all the paint marks that was on the floor was all covered. there are parts of the floor which is slightly uneven however this will work well with the work, I have been thinking about placing gravel inside the space to create an uneven surface this only adds to this idea.

IMG_5472.JPG
uneven surface in entrance

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s