Degree Show:

met with the technicians today to discuss how I’m going to set up the space in time for assessment. Together we decided on a simplified layout for the space.

fullsizeoutput_70d.jpeg
New plan os space (green is where walls will now go)

Two thing that came up when talking the technicians leading to this change was that some walls would have to double skins increasing the width of the wall making a already  tight space too tight for most people. I also found out that I had to leave right of the entrance enough space for door which needs to open all the way this is due to a box for the electric lift being in the space.

SaveSaveSaveSave